Sinking Feeling
An international courier was faced with a subsidence problem at its warehouse facility in Northamptonshire. The warehouse’s office building (20m x 15m) had sunk by 70mm due to subsidence and was causing safety risks and operational issues. The ground needed to be strengthened and the building raised and re-levelled to ensure the business could operate safely.
Mainmark was chosen as the principal contractor for this ground improvement project, thanks to our market leading ground improvement solutions and extensive experience working with large commercial warehouses, as well as our range of advanced technologies offering non-invasive, cost-effective and time-efficient solutions. We needed to complete work quickly and with no business interruption.
We used a bespoke combination of our JOG Computer-Controlled Grouting (JOG) technology, offering a greater level of precision and control, and our proprietary Teretek® resin injection, a non-invasive solution able to deliver both ground improvement and re-levelling to help lift the office building, with no business disruption whatsoever.